Switchback Testing

  • Plan the maintenance window: Set an appropriate time to perform the switchback after completing maintenance or updates.
  • Initiate the switchback process: Promote the system on standby during the switchover back to the primary position, and demote the temporary primary system to the standby position.
  • Verify the switch: Ensure the switchback is completed successfully and the systems have returned to their original configuration.
  • Monitor data synchronization: Verify that data replication remains in sync after the switchback and that no data loss occurred during the process.