Disaster Recovery Plan (DRP)
Switchover Testing
- Plan the maintenance window: Consider system availability and workload and set an appropriate time to perform the switchover test.
- Initiate the switchover process: Perform the switchover action to change roles between the primary system and the standby in a controlled manner.
- Verify the switch: Ensure the switchover is completed successfully and the systems have exchanged roles correctly.
- Monitor data synchronization: Verify that data replication remains in sync between the former primary and the new primary after the switchover.
2024. BCTeck Group. All rights reserved