Switchover Testing

  • Plan the maintenance window: Consider system availability and workload and set an appropriate time to perform the switchover test.
  • Initiate the switchover process: Perform the switchover action to change roles between the primary system and the standby in a controlled manner.
  • Verify the switch: Ensure the switchover is completed successfully and the systems have exchanged roles correctly.
  • Monitor data synchronization: Verify that data replication remains in sync between the former primary and the new primary after the switchover.