Failover Testing

  • Simulate a failover: Create a controlled environment to simulate a failure on the primary system or the source server.
  • Activate the failover process: Initiate the failover process manually or using automated tools and scripts to allow the secondary system or standby server to assume the primary role.
  • Verify the switch: Ensure that the switch is performed correctly and that the secondary system has become the new primary.
  • Monitor the recovery time: Measure the time required to complete the failover and ensure it meets the established Recovery Time Objective (RTO) goals.